PROJECT DATE COMPLETED
Repower with Beta Marine 60 HP 1/2014
Clean/paint engine room 11/13
Clean diesel stove 12/13
Insulate engine room 5/2014
Rebed all deck hardware
Locate/repair leak into the master cabin head cabinet
Replace propane hoses and connectors 10/13
Create propane locker
Clean bilges and paint as necessary 11/13
Clean and paint wall in quarter berth 11/13
Rewire AC
Redesign DC charging, including adding inverter
Fix leaking hatch in master cabin – In July 2015 we discovered this is likely a leak under the mizzen mast.
Repair water damage to interior wood in master
cabin and in salon – can’t do this until that leak under the mast is fixed.
Replace refrigeration unit – Done
New cushions/upholstery in main salon – recovered July 2014
New cushions/upholstery in master cabin – June 2016
Organize workshop area 3/2015
Replumb holding tank in aft head 2/2014
Buy navigation electronics – 2/2014
Rebed overhead window in hard dodger – 2014
New seals around forward windows in hard dodger
Replace lenses in lewmar hatches 8/2015
Possible redesign of aft cabin 6/2016
Redesign of salon settee/table area ?
Replace deck drains that are standing high with countersunk units OR install scuppers so water drains directly overboard Drain replaced 2017, and this also relieved us of a smell we had trouble identifying.
Refit galley: new sink, countertops, plumbing, maximize cabinet space.
Buy and install Strong Track on both masts
Buy and install Stack Pack for main and mizzen – Main stackpack purchased 2015
Repair fiberglass in windlass locker, remove and service windlass Done 2016
Have sails serviced, replace mainsail if needed
Inspect and tune rig
Replace boom vang
Replace running rigging
Replace lifelines Done 2017
Create stowage on aft deck, likewise organize aft lazerette
Inspect and service aft windlass. Replace chain on aft anchor
Inspect and regalvanize anchor chain Done 7/2016
Spot refinish hard dodger where paint is peeling. Inspect canvas window covers and see that they fit, adding snaps to wood where necessary.
Rebuild both heads Aft head done Feb 2017
Shower facelift
Create shelving in hanging lockers for extra stowage. Done Jan/Feb 2017