S/V Galapagos Project List

PROJECT                                                         DATE COMPLETED

Repower with Beta Marine 60 HP                    1/2014

Clean/paint engine room                                      11/13

Clean diesel stove                 12/13

Insulate engine room       5/2014

Rebed all deck hardware

Locate/repair leak into the master cabin head cabinet

Replace propane hoses and connectors                10/13

Create propane locker

Clean bilges and paint as necessary            11/13

Clean and paint wall in quarter berth            11/13

Rewire AC

Redesign DC charging, including adding inverter

Fix leaking hatch in master cabin – In July 2015 we discovered this is likely a leak under the mizzen mast.

Repair water damage to interior wood in master
cabin and in salon – can’t do this until that leak under the mast is fixed.

Replace refrigeration unit – Done

New cushions/upholstery in main salon – recovered July 2014

New cushions/upholstery in master cabin – June 2016

Organize workshop area 3/2015

Replumb holding tank in aft head  2/2014

Buy navigation electronics – 2/2014

Rebed overhead window in hard dodger – 2014

New seals around forward windows in hard dodger

Replace lenses in lewmar hatches 8/2015

Possible redesign of aft cabin 6/2016

Redesign of salon settee/table area ?

Replace deck drains that are standing high with countersunk units OR install scuppers so water drains directly overboard   Drain replaced 2017, and this also relieved us of a smell we had trouble identifying.

Refit galley: new sink, countertops, plumbing, maximize cabinet space.

Buy and install Strong Track on both masts

Buy and install Stack Pack for main and mizzen – Main stackpack purchased 2015

Repair fiberglass in windlass locker, remove and service windlass Done 2016

Have sails serviced, replace mainsail if needed

Inspect and tune rig

Replace boom vang

Replace running rigging

Replace lifelines   Done 2017

Create stowage on aft deck, likewise organize aft lazerette

Inspect and service aft windlass. Replace chain on aft anchor

Inspect and regalvanize anchor chain  Done 7/2016

Spot refinish hard dodger where paint is peeling. Inspect canvas window covers and see that they fit, adding snaps to wood where necessary.

Rebuild both heads  Aft head done Feb 2017

Shower facelift

Create shelving in hanging lockers for extra stowage.  Done Jan/Feb 2017

 

 

 

 

 

Leave a Reply

Your email address will not be published. Required fields are marked *